ENERGY
DEVELOPED ENERGY PROJECTS
Ataseven Group has developed 53 Wind Power Plants with a total capacity of 2.405 MW, 23 WPP YEKAs with a total capacity of 2.495 MW, 3 Hydroelectric Power Plants with a total capacity of 74 MW, and 7 Solar Power Plants with a total capacity of 130 MW.
OPERATING ENERGY PROJECTS
Ataseven Group operates 7 Wind Power Plants with a total capacity of 121 MW.
The operating energy projects supply the annual electricity demand of 102,000 households and reduce emissions of approximately 205,700 tons of CO2e per year. 205,700 tons of carbon emission reduction is equivalent to approximately 123,450 hectares of forest land.
ENERGY PROJECTS TO BE COMMISSIONED
Ataseven intends to commission 2 Wind Power Plants with a total capacity of 161 MW and 3 additional wind power plants with a total capacity of 173,2 MW in 2022.
When 5 wind power plants are put into operation, the annual electricity demand of 318.500 households will be met, and approximately 620.000 tons of CO2e emissions will be reduced annually. 620.000 tons of carbon emission reduction is equivalent to approximately 330.000 hectares of forest land.